Australian owned QHSE software and consulting
Training and inductions

Every worker inducted, coached and current.

Build an induction or training pack as an interactive presentation with questions, or have it drafted for you. It runs inside MiSAFE on a computer, tablet or phone, so there is no SCORM package to build and no separate learning system. Trainees must get every answer right, with coaching on the ones they miss, then sign off. A register, matrix and calendar show who is trained, who is due, who is overdue and what is booked this month.

How it works

From induction to a current training matrix.

1

Build

Slides, video and questions in the training builder, or a full draft prepared for you, reviewed and approved before use.

2

Assign

Assign by person, role, campus, project or rule. New employees and contractors get the right inductions automatically.

3

Coach and sign

Every answer must be right. Missed questions come back with coaching on why, then the trainee signs the declaration.

4

Track and schedule

The matrix, register and calendar show completions, expiries and booked sessions, including external providers.

Training in MiSAFE

Interactive training that runs inside MiSAFE. No SCORM needed.

Trainees click through the presentation, answer the questions inside it and sign off, on a computer, tablet or phone. There is no SCORM package to build, no separate learning system to run, and every result lands in the training register.

01

Build it, or have it drafted

Slides, narration, video and questions in one builder, with a live preview of exactly what the trainee will see. Start from a blank pack, from your own procedures, or from a draft MiSAFE prepares for you.

02

Answer inside the presentation

Each question sits inside the presentation. Pick an answer and MiSAFE responds straight away: a wrong answer brings up coaching on why, and the trainee tries again until it is right.

03

Coached until every answer is right

The pass mark is 100%, so nobody signs off with a gap in what they know. The first-time score is kept for the record, so you can see which questions people find hard.

04

Signed and on the record

When every answer is right, the trainee reads the declaration and signs on screen. The completion, the score and the signature go straight to their training record and the matrix.

05

See who is done, and what people found hard

Each pack shows who has completed it, who is part way and who does not have it yet, and the questions people most often had to go back over, so you know what to explain better at the next toolbox talk.

Inside the system

Where it lives in MiSAFE QHSE.

The hub, what you can do there, what its snapshot watches and what turns an item red.

People & Competency

Training and Competency

Who needs what, who has it, what is due in 7 days and what is overdue.

What you can do here
  • Company WHS induction (video, slides, the WHS management plan, questions and sign-off)
  • Site or project induction
  • Verification of competency (forklift, EWP, heights, confined space, traffic control)
  • Training and induction register / matrix with needs analysis
  • Assign training or induction
  • Training calendar and bookings
  • Build or edit in Creation Studio
What the snapshot watches
OverdueDue within 7 daysAssigned, not startedCompleted and currentLicences expiring in 30 days
What turns redTraining past its due date. Workers see only the training assigned to them, in the app, and compliance shows by pack and by department.
Training and Competency, in the demo school account
ISO 45001 cl 7.2 · WHS Act s19(3)(f) · WHS Regulation r39
Training and competency: who is current, due and overdue, by pack and by department
What you get

Ready on day one, set up for you.

  • WHS, site and project inductions specific to each campus or project
  • Training builder with slides, narration, video and questions, and a live preview of what the trainee sees
  • Interactive presentations that run inside MiSAFE on any device, with no SCORM package or separate learning system needed
  • Every answer right with coaching, and the first-time score kept for the record
  • A signed declaration at the end of every pack, saved to the person’s training record
  • Training and induction register, matrix and needs analysis
  • Training calendar with booked sessions and external providers
  • Licences, tickets and verification of competency tracked to expiry
  • Existing videos, documents and SCORM packages can still be added where you have them
Compliance built in

What regulators, auditors and clients expect.

What the law or standard asks of you, in plain words, and what MiSAFE QHSE does to help you meet it.

Give people the information, training, instruction and supervision they need Inductions and training packs are assigned by role, and the matrix shows who is current, due or overdue.
WHS Act s19(3)(f)
Make the training suitable for the work and the people doing it Packs are built as slides with questions, and people are coached until every answer is right before they sign off.
WHS Regulation r39
Make sure construction workers hold a general construction induction card White cards are recorded with the person, and site access checks them before work starts.
WHS Regulation r316 and r317
Show that people are competent and aware Training records, sign-offs and refresher dates are kept per person and ready for an auditor.
ISO 45001 cl 7.2 and 7.3

Training and inductions, set up for your organisation.

A demo built around your sites, your people and the records you keep today.